The existing Speir Building roof provides another vantage point to view the progress.
![]() |
| Mechanical Penthouse. The door will be on the one side without the Cross Bracing |
![]() |
| Looking down into the Student Locker and Break Room |
![]() |
| The Student entry is in the small Courtyard between the buildings |
![]() |
| Roof top Chiller platform. The 4 posts supporting the platform and the fasteners need to be galvanized (silver). This work will be redone. |




No comments:
Post a Comment