![]() |
| View looking North along the East wall. |
![]() |
| Spandrel Slab detail Shear Studs welded to the structure below connect the slab to the steel framing. |
![]() |
| Those two pieces of Red Iron are for anchoring posts which will frame the rooftop mechanical garden |
![]() |
| Future second floor classroom. |
![]() |
| Box out in slab for air-conditioning ductwork. |
View looking down the corridor to the connector. Elevator is on the left.
Elevator machine connects through those three conduits.






No comments:
Post a Comment