![]() |
| The second floor slab begins to take shape |
![]() |
| Slab edge detail at the East Wall columns |
![]() |
| View into the clinic from the Patient entry |
![]() |
| Future clinic corridor with sterilization on the right |
![]() |
| From this view, the addition appears to be hiding behind the tree. |







No comments:
Post a Comment