![]() |
| Second Floor Steel Decking prior to Concrete |
![]() |
| Looking South towards the Connector and Elevator Shaft |
![]() |
| Penetrations in the slab are mapped out ahead of the pour |
![]() |
| This is a floor drain in the utility room. That tube connected to the drain is part of the trap primer. Here is a typical trap primer schematic. |
A View out from the top landing of the North Stair





























