Last Tuesday, June 28th, 2011, the second floor slab was poured. This is a significant milestone in the project. Now that the second floor slab is in place, the pace of construction should pick up.
 |
Concrete placement started at daybreak. |
 |
The concrete specifications call for a 5,000 psi mix. It took several truckloads to complete the pour. |
 |
The morning after the pour. |
 |
Looking out towards the Eastern curved wall. |
 |
Slab edge detail at curved wall. |
 |
Looking back at the connector and elevator shaft. |
 |
Connector slab and building slab edges. |
James,
ReplyDeleteThis is so awesome. I love being able to follow along and see the progress. The photos are great! Thanks for making the effort so I can enjoy the process, too. Love to you