Tuesday, July 5, 2011

July 5, 2011 - Second Floor Slab

Last Tuesday, June 28th, 2011, the second floor slab was poured.  This is a significant milestone in the project.  Now that the second floor slab is in place, the pace of construction should pick up. 

Concrete placement started at daybreak.
The concrete specifications call for a 5,000 psi mix.    It took several truckloads to complete the pour.
The morning after the pour.
Looking out towards the Eastern curved wall.

Slab edge detail at curved wall.

Looking back at the connector and elevator shaft.

Connector slab and building slab edges.