June 24, 2011 - Second Floor Slab Prep

Second Floor Steel Decking prior to Concrete
Looking South towards the Connector and Elevator Shaft
Penetrations in the slab are mapped out ahead of the pour 
This is a floor drain in the utility room.
That tube connected to the drain is part of the trap primer.
Here is a typical trap primer schematic.
A View out from the top landing of the North Stair

5 comments:

  1. Looking good! Saw the pump for the concrete last night on the way to Market Commons to watch the first CWS game. Thanks for the postings! It's all so exciting!

    ReplyDelete
  2. One benefit of growing upward is that you don not have to move to acquire additional space. If you like the location of your home or building, especially if your property has enhancing advantages, adding a second story is a very popular way to obtain the additional space without losing the neighborhood features you love. Enhancing advantages might include a view of water or a view of mountains.

    ReplyDelete
  3. what is the span of the open web joists?

    ReplyDelete
  4. Polishing and sealing is the main procedure in marble fabrication as it defines the true value of marble. The slabs of marble are placed on a platform where machine with artificial diamonds smoothness the surface of the marble until partial reflection are visible on the marble. silver travertine slabs

    ReplyDelete