This blog follows the construction progress of a state-of-the-art addition to Horry-Georgetown Technical College's dental program, located on their Myrtle Beach campus. The new facility will serve the community by offering students a state-of-the-art learning and training center, as well as providing a dental clinic to community residents.
![]() |
| An architectural screen wall provides a common area for the Rooftop Mechanical equipment |
![]() |
| The chiller platform in the foreground is elevated 4' above the roof deck to facilitate roof repairs and maintenance. |
![]() |
| Screen Wall Detail |
![]() |
| Building is topped and taking shape. |
![]() |
| South Elevation. The curved wall at the scaffold will be brick. |
![]() |
| Workman re-applies spray-on air and vapor barrier to the building envelope. |
![]() |
| Masons building the firewall at the Connector |
![]() |
| Team discusses the removable portion of the Rooftop Mechanical Screen |
![]() |
| Looking through some of the Faculty Offices on the second floor |
![]() |
| Looking into the second floor corner office |
![]() |
| Large 80 person classroom taking shape |
![]() |
| Head of wall detail. |
![]() |
| View of the first floor bathroom entry vestibule |
![]() |
| Those two puddles are intentional - They are bathroom floor drain locations |
![]() |
| View of the East wall parapet framing |
![]() |
| Workers frame the south exterior wall |
![]() |
| Exterior Sheathing going up along the East wall |
![]() |
| You can see the new silver exterior framing at the base of the Eastern wall columns |
![]() |
| Detail at base of column |
![]() |
| The Construction Documents require that all ductwork be sealed while under construction. This prevents dust and construction particulates from contaminating the ductwork. |
![]() |
| Taking Shape |
![]() |
| Last week Precision Walls installed the partition framing on the second floor while the plumbers, RC Jacobs, worked roughing-in the plumbing from the ground floor below. |
![]() |
Looking East from the North Stair, second floor. Faculty offices straight ahead and to the left. |
![]() |
| Shared Ground Floor plumbing stack. Mens room to the right and Womens room to the left. |
![]() |
| Looking South, second floor corridor. Classrooms are to the left and to the right. |
![]() |
| These sleeves fit within the cavity wall for plumbing in this location. |
![]() |
| These sleeves will be relocated into the cavity wall to the right. |
![]() |
| Electrical conduits for a wall panel on left and Roof drain sleeve on the right. |
![]() |
| Contractor is using the largest classroom on second floor for material staging. |
![]() |
| Floor slab and curb poured at Mechanical penthouse. Penthouse roof framing and sheathing is also in place. |
![]() |
| Until the next Post... Lookin' Good! |
![]() |
| Now that the second floor slab is placed and the steel columns are true, the isolation pockets at the base of the East wall columns are being filled with concrete, |
![]() |
| Looking south down central corridor in the clinic, sterilization is to the right. These isolation pockets at the base of the short columns are round and still need to be filled with concrete. |
![]() |
| Welder works on full penetration welds as Special Inspector stands by. Each one of these special Full Penetration Welds takes about half a day. There are at least 40 of these welds required on the project. |
![]() |
| Detail of completed weld. |
![]() |
| Special Inspector sign-off of completed weld. Translation: "Inspected by MT, weld is OK, June 30th" |
![]() |
| Welder works off special platform in a hard to reach spot. |
![]() |
| Detail of platform. |
![]() |
| Workers preparing to pour the slab in the mechanical penthouse. |