| Landscaping and the first coats of exterior paint have been installed |
| Stand of mature Water Oaks along Mallard |
![]() |
| North Student Entry Canopy detail |
This blog follows the construction progress of a state-of-the-art addition to Horry-Georgetown Technical College's dental program, located on their Myrtle Beach campus. The new facility will serve the community by offering students a state-of-the-art learning and training center, as well as providing a dental clinic to community residents.
| Tall baseboards are meant to visually tie the doors to the floors |
| Student Lobby at the connector |
| Central sterilization utilizes a pair of pocket doors |
| Materials Lab - Glass and sidelights - A typical arrangement in this naturally lit building |
| The office door at the end the second floor hall sheds a little light |
| Faculty office doors at the second floor |
| Office doors have translucent between the glass blinds |
| Men working forming the handicapped ramp at the South end of the building |
| Electrician installing the exterior canopy lighting. Canopy glazing is due in next week. |
| With the job trailer gone, we get our first full view of the public entry. |
| Now that the exterior stucco system is complete, the roofers can complete their work. |
| Irrigation is being put in place prior to arrival of the landscape plantings |
| North stair tower looking substantially complete |