| |
| South side of the building. The grey plaster will be painted once it fully cures. |
| Landscapers have completed the irrigation and are starting to plant the site |
This blog follows the construction progress of a state-of-the-art addition to Horry-Georgetown Technical College's dental program, located on their Myrtle Beach campus. The new facility will serve the community by offering students a state-of-the-art learning and training center, as well as providing a dental clinic to community residents.
| Tall baseboards are meant to visually tie the doors to the floors |
| Student Lobby at the connector |
| Central sterilization utilizes a pair of pocket doors |
| Materials Lab - Glass and sidelights - A typical arrangement in this naturally lit building |
| The office door at the end the second floor hall sheds a little light |
| Faculty office doors at the second floor |
| Office doors have translucent between the glass blinds |
| Men working forming the handicapped ramp at the South end of the building |
| Electrician installing the exterior canopy lighting. Canopy glazing is due in next week. |
| With the job trailer gone, we get our first full view of the public entry. |
| Now that the exterior stucco system is complete, the roofers can complete their work. |
| Irrigation is being put in place prior to arrival of the landscape plantings |
| North stair tower looking substantially complete |
![]() |
| View towards Sterilization from the Dental Assisting Clinic. |
![]() |
| Sterilization room cabinetry |
![]() |
| Paired Simulators |
![]() |
| Simulator slides under the teacher's worktop in the Sim Lab |
![]() |
| Student lockers are now in place too |
![]() |
| Outside the building, Santee Cooper, the local Power Utility, has provided a Vehicle Charger - Got a Volt? |