Entrance Canopy Arrives

Over a year since construction began, some of the finishing touches are beginning to take shape.  Here are some pictures of the Main Entrance Canopy.  The canopy was detailed, fabricated, and installed by Novum Structures Inc., out of Wisconsin, USA.


Worker adjusting upper bracket in final preparation prior to the erection of the canopy.
Although constructed entirely of straight pieces, the segmented design curves with the face of the building
Canopy Detail as seen from the Outside at the Ground Level.

Canopy Detail as seen from the Inside at the Second Level.
Workers fine tuning the slope of the assembly at an adjustable hanging rod.

Saturday, January 7, 2012

January 7, 2012

View of Lobby from Checkout.

Clerestory at locker room.
Solar shades will be attached to the exterior which will soften the light.

View of one of the protected Water Oaks from an office on the second floor.

Curtainwall framing at Connector.
Those pockets in the slab are for the columns which will support the entry canopy.

View of South side of connector.