Monday, May 30, 2011

May 28, 2011 - Steel - Begin Sequence Two

Sequence One tops out with the small mechanical penthouse on the roof

Looking into the Dental Clinic from the Student Corridor

Looking through the Second Floor bathrooms to the Elevator and North Stair Tower

A stand alone concrete firewall separates the two buildings at the connector





May 15, 2011 - Shakin' Out the Steel - Sequence One

Worker's topping out the masonry on the North Stair Tower

Conduits in slab foretell future Dental Clinic locations
The curved Eastern Facade prior to going vertical

Duggins Steel Erectors, from NC, shake out Sequence One
New Addition to the left and Existing Speir Building to the right